The next development project in Ziyun is set to the drawing board.

Anna has brought attention to another project that requires urgent help.  The Sang He Bridge project came about because the former wooden bridge spanning the river was washed away by the strong currents and the villagers needed to cross the river.  At the present moment, the school children have to be carried one by one by their teachers across the river to their school.  The new bridge will be 5m high and 7m long and estimated to cost around B$6000.00.  A proper estimate will be made pending the drawings by an engineer.  In the meantime, your contributions and support for this project through RBCS Brunei will be very much appreciated.